https://urkesh.org/MZ/A/A14/D/-INC/methods and techniques.htm

Unit Book A14

A14-methods and techniques

Processed on 2024-07-27


Date Author Record
2004-06-30 jw gb reviewed A14 database, transferred to the main server for backup. He wants to prepare a preliminary browser edition to illustrate its utility during excavation. jw and gm must, during O702 and O703 oganize and catalog photos and prepare templates and plots to complete the database prior to running the programs for the browser edition. [Input: O630JW.j]
2004-07-14 jw fab suggested that, that to improve safety, we change a wheelbarrow bridge across an eroded gully from one constructed of wood slabs to one constructed of a burlap bag filled with dirt. This new arrangement is immesurably better. [Input: O715JW.j]